Performance and Operation of Partial Infiltration Permeable Pavement Systems in the Ontario Climate

dc.contributor.advisorBradford, Andrea
dc.contributor.authorDrake, Jennifer Anne Pauline
dc.date.accessioned2013-07-09T13:03:00Z
dc.date.available2013-07-09T13:03:00Z
dc.date.copyright2013-06
dc.date.created2013-06-17
dc.date.issued2013-07-09
dc.degree.departmentDepartment of Historyen_US
dc.degree.grantorUniversity of Guelphen_US
dc.degree.nameDoctor of Philosophyen_US
dc.degree.programmeEngineeringen_US
dc.description.abstractPartial-infiltration permeable pavement (PP) systems provide environmental benefits by increasing infiltration, attenuating storm flows and improving stormwater quality. This thesis focuses on the performance and operation of partial-infiltration PP systems over low permeability soil in Ontario. Three PP, AquaPave®, Eco-Optiloc® and Hydromedia® Pervious Concrete were monitored over two years and their performance was evaluated relative to an impermeable Asphalt control. Field data was collected from the Kortright PP pilot parking lot in Vaughan, Ontario. Through the use of restrictor valves on underdrains the PP systems were shown to provide substantial hydrologic benefits by eliminating stormwater outflow for rain events less than 7mm, reducing peak flows by 91% and reducing total stormwater volume by 43%. Stormwater quality was analyzed for winter and non-winter seasons. The PP were shown to greatly reduce the concentration and total loading of suspended solids, nutrients, hydrocarbons and most heavy metals. Some water quality data, such as pH, K, or Sr levels, indicate that the quality of PP effluent will change as the system ages. Study of PP sample boxes at the University of Guelph highlighted the role that construction materials have on effluent quality and showed that pollutants introduced by the pavement and aggregate are almost entirely in a dissolved form and decline very rapidly after a season of exposure to rainfall. Benefits to water quality were sustained during winter months. The partial-infiltration PP systems were shown to provide buffering of Na and Cl concentrations. Small and large-scale maintenance practices for PP systems were investigated. Small-sized equipment testing found that vacuum cleaning and pressure-washing have good potential to improve infiltration capacity. Testing of full-sized streetsweeping trucks demonstrated that permeability can be partially restored on PICP by suction-based sweeping. Vacuum-sweeping was beneficial on a PC pavement which had experienced large permeability losses. Results of this study indicate that partial-infiltration PP systems can be effective measures for maintaining or restoring infiltration functions on parking lots and other low volume traffic areas, even in areas with low permeability soils.en_US
dc.identifier.urihttp://hdl.handle.net/10214/7277
dc.language.isoenen_US
dc.publisherUniversity of Guelphen_US
dc.rightsAttribution-NoDerivs 2.5 Canada*
dc.rights.urihttp://creativecommons.org/licenses/by-nd/2.5/ca/*
dc.subjectlow impact developmenten_US
dc.subjectstormwateren_US
dc.subjectpermeable pavementen_US
dc.subjectpermeable interlocking concrete pavementen_US
dc.subjectpervious concreteen_US
dc.subjectlow permeability soilen_US
dc.subjectcold climateen_US
dc.subjecthydrologyen_US
dc.subjectinfiltrationen_US
dc.subjectwater qualityen_US
dc.subjectrehabilitationen_US
dc.titlePerformance and Operation of Partial Infiltration Permeable Pavement Systems in the Ontario Climateen_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Drake_Jennifer_201306_PhD.pdf
Size:
5.16 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.69 KB
Format:
Item-specific license agreed upon to submission
Description: